Plans and other materials relevant to the following agenda items are posted on the Conservation Commission website: https://www.hingham-ma.gov/866/Pending-Applications.
1.
Approval of Draft Minutes – June 29, 2020
2.
Certificates of Compliance
a.
37 Bel Air Road – DEP 034-1220
Applicant: Carolyn Terry
Representative: Gregory Tansey, Patriot Permitting and Engineering
3.
Requests for Determination of Applicability
a.
33 Beach Road, continued from 6/29/20
Applicant: Garret Daigler
Proposed: Construction of two additions
b.
4 Quail Run
Applicant: Timothy & Lindsay Mullaney
Representative: Lisa Swanson, Zinnia Designs
Proposed: Installation of retaining wall and fill
c.
12 Evergreen Lane
Applicant: Jonathan Kirk
Representative: Colin McSweeney, McSweeney Associates, Inc.
Proposed: Reconfiguration of existing driveway
4.
Notices of Intent
a.
100 Industrial Park Road – DEP 034-1361, continued to 8/3/20
Applicant: Timothy Casey, JEB Group, LLC
Representative: Kevin Hixson, BL Companies
Proposed: Warehouse renovation and demolition, and site improvements
b.
111 Weir Street – DEP 034-1366, continued from 6/15/20
Applicant: Canterbury Street LLC
Representative: Gary James, James Engineering, Inc.
Proposed: Construction of single-family home and site improvements
c.
19 & 27 Whiting Street – DEP 034-1368, continued to 8/3/20
Applicant: Merhej & Sons Realty, LLC
Representative: Donald Rose, CHA Consulting, Inc.
Proposed: Demolition of single-family home and construction of retail building with site improvements
d.
185-193 Lincoln Street & 6 Crow Point Lane – DEP 034-1371, cont’d from 6/29/20
Applicant: 185-193 Lincoln Street, LLC
Representative: Carmen Hudson, Cavanaro Consulting, Inc.
Proposed: Parking lot improvements
e.
299 Rockland Street – DEP 034-XXXX
Applicant: Steve & Jessica Govoni
Representative: Brian Kates, Kates Construction Associates, LLC
Proposed: Reconstruction of garage and site improvements
f.
1 Foley Court – DEP 034-XXXX
Applicant: James Randall
Representative: Colin McSweeney, McSweeney Associates, Inc.
Proposed: Replacing existing septic system with sewer line connection
g.
66 Burditt Avenue – DEP 034-XXXX, continued to 8/3/20
Applicant: Jesse & Daria Johnson
Representative: Rebecca Verner, Gregory Lombardi Design, Inc.
Proposed: Reconstruction of swimming pool and site improvements
5.
Other Business
a.
Review and approval of a new patio as a field change – 19 Stagecoach Road (DEP 034-1323)
b.
Discussion of proposed changes to Bow Hunting Regulations
6.
Adjourn