Applications Pending
392 Main Street
Site Plan Review Waiver Request
Spiros Giannaros filed a request for a waiver of Site Plan Review under § I-I, 9 of the Zoning By-Law, and such other relief as necessary to modify plans originally approved December 1, 2021 to construct a sports court and make stormwater system improvements in Residence District A.
- Site Plan Review Waiver Request, dated December 22, 2022
- Site Plan, revised December 22, 2022
- Site Plan Review Waiver Request and Stormwater Calculations, dated January 26, 2023
0 Station Street
Special Permit A3 & Site Plan Review Modifications
Hingham Farmers Market, Inc. filed applications for modification of a Special Permit A3 and Site Plan Approval, both originally issued April 21, 2021, under §§ V-A and I-I of the Zoning By-Law, and such other relief as necessary to increase the footprint and number of vendors for the seasonal Farmers Market in the Official and Open Space District.
- Application Package, dated December 20, 2022
457 Main Street
Site Plan Review
JJF Investments, LLC filed an application for Site Plan Review under § I-I of the Zoning By-Law, and such other relief as necessary to construct a single-family dwelling and make other improvements including a paved driveway, grading, and landscaping in Residence District A.
- Application Package, dated December 22, 2022
- Zoning Analysis Letter
- Stormwater Report, revised October 28, 2022
- Landscape Plan, revised December 5, 2022
- Plan Set, revised December 22, 2022
- Architectural Plans, dated December 22, 2022
Peer Review
- P. Brennan Peer Review Report, dated January 24, 2023
170 Chief Justice Cushing Highway
Site Plan Review
Joseph Mahoney filed an application for Site Plan Review under § I-I of the Zoning By-Law, and such other relief as necessary to construct a single-family dwelling and make other improvements including a paved driveway, walkway, grading, and landscaping in Residence District C.
- Site Plan Review Application and Stormwater Report, dated December 13, 2022
- Site Plan, dated December 13, 2022
- Cut and Fill Plan, dated December 13, 2022
- Architectural Plan
- Site Plan, revised January 6, 2023
Peer Review
- P. Brennan Peer Review Report, dated January 11, 2023
102 Downer Avenue
Site Plan Review
Matthew and Stacey Corson filed an application for Site Plan Review under § I-I of the Zoning By-Law, and such other relief as necessary to raze and rebuild a single-family dwelling and make other improvements including an inground swimming pool, pervious driveway, landscaping, and hardscaping in Residence District A.
- Site Plan Review Application, dated December 9, 2022
- Site Plan, dated December 8, 2022
- Architectural Plans, dated December 9, 2022
- Stormwater Report, dated December 6, 2022
- Elevation Plans, dated December 12, 2022
- Construction Schedule
- Site Plan, revised January 5, 2023
- Response to Staff Comments, dated January 10, 2023
- Response to Peer Review Comments, dated January 18, 2023
- Operations and Maintenance Plan, revised January 18, 2023
- Site Plan, revised January 18, 2023
Peer Review
- P. Brennan Peer Review Report, dated January 10, 2023
- P. Brennan Peer Review Report, dated January 19, 2023
226 Beal Street - Lynch Field
Special Permit A3 Modification & Site Plan Review Waiver
Hingham Municipal Light Plant filed applications for modification of a Special Permit A2 parking determination, originally issued February 1, 2006, under § V-A, a Special Permit A3 parking determination, and a waiver of Site Plan Review under § I-I of the Zoning By-Law, and such other relief as necessary to install an electric vehicle charging station in the Official and Open Space District.
- Application Package, dated December 12, 2022
- Site Plan, dated February 9, 2006
- EV Charging Plan
- Public Comment from D. Beal and K. Almand, received January 17, 2023
- Public Comment from M. and R. Linares, received January 19, 2023
- Public Comment from A. and A. Groh, dated January 19, 2023
- Public Comment from R. and L. Freeman, dated January 21, 2023
- Existing Conditions
- Public Comment from J. Strehle, dated January 22, 2023
181 North Street
Site Plan Approval & Special Permit A3 Modifications
Hingham Historical Society filed applications to modify a Site Plan Approval and Special Permit A3 Parking Determination, both originally issued December 4, 2020 under §§ I-I and V-A of the Zoning By-Law, and such other relief as necessary to relocate an accessible parking space and walkway, eliminate one parking space, and make other related improvements in Residence District A.
- Site Plan Review Modification Request
- Special Permit A3 Modification Request
- Site Plan, revised December 14, 2022
- Modifications Plan, revised December 16, 2022
- Certified Arborist Letter, dated January 5, 2023
- Traffic Management Plan, dated January 6, 2023
- Site Plan, revised January 6, 2023
- Public Comment from F. and N. Mellen, dated January 6, 2023
- Public Comment from D. Fitzgerald, dated January 9, 2023
- Continuance Request, dated January 19, 2023
Previous Decisions & Plans
- Previous Site Plan Approval Decision, dated December 4, 2020
- Previous Special Permit A3 Decision, dated December 4, 2020
- Approved Site Plan, revised through October 27, 2020
19 Clubhouse Drive
Site Plan Review
Black Rock Country Club filed an application for Site Plan Review with waiver requests under § I-I of the Zoning By-Law and such other relief as necessary to construct a 1,480 SF golf simulator accessory building and make related improvements in Residence District C.
- Application Package, dated November 30, 2022
- Architectural Set, dated August 31, 2022
- Response to Staff Comments, dated January 3, 2023
- Waiver Requests
0 Burr Road
Site Plan Review
The Town of Hingham filed an application for Site Plan Review with waiver requests under § I-I of the Zoning By-Law and such other relief as necessary to repave the street hockey rink and make related improvements in the Official and Open Space District.
- Site Plan Review Application
- Supplemental Letter, dated December 12, 2022
- Plan Set, dated December 12, 2022
- Waiver Requests
- Plan Set, revised January 5, 2023
- Explanation of Revisions, dated January 6, 2023
213 & 215 Cushing Street
Definitive Flexible Residential Development (FRD)
Bristol Bros. Development Corp. filed an application for a Definitive Flexible Residential Development (FRD) under § IV-D of the Zoning By-Law, the Subdivision Control Law, and the Rules and Regulations of the Hingham Planning Board, along with Site Plan Review under § I-I of the Zoning By-Law, and such other relief as necessary for a Flexible Residential Development consisting of eight single-family dwellings on 7.48± acres of land in Residence District C and the Accord Pond Watershed and Hingham Aquifer Protection District.
- Application for a Definitive FRD, dated November 28, 2022
- Definitive FRD Plan Set, dated November 21, 2022
- Stormwater Report, dated November 21, 2022
- Board of Health Comments, dated January 4, 2023
- Continuance Request of FRD and SPR Application, dated January 11, 2023
- Continuance Request of Subdivision Application, dated January 11, 2023
- Continuance and Extension, dated January 24, 2023
Peer Review
- Peer Review Report from J. Dirk, dated December 19, 2022
- Peer Review Report from P. Brennan, dated December 22, 2022
Previous Decision
- Preliminary FRD - Special Permit A3 Decision, dated March 28, 2022
55 South Street
Special Permit A3 Modification and Site Plan Review Waiver
Charlene and Reuven Levi submitted applications to modify a Special Permit A3 Parking Determination originally issued September 21, 2016 under §§ III-G, 7.a(iv) and V-A, and a waiver of Site Plan Review under § I-I, 9 of the Zoning By-Law to fulfill parking requirements for the dwelling units in an existing Commercial/Residential Building in the Business A District and Downtown Hingham Overlay District through off-site spaces designated in the resident parking permit program.
- Application Package, dated November 14, 2022
- Special Permit A3 Decision, dated September 21, 2016
- Site Plan Review Decision, dated September 21, 2016
73 Abington Street
Site Plan Review Waiver and Special Permit A3 Modification
Gill Research Drive LLC submitted a request for a waiver of Site Plan Review under § I-I,9 and an application for modification of a Special Permit A3 Parking Determination under § V-A of the Zoning By-Law, to modify plans approved in connection with a Site Plan Approval and Special Permit A3 issued February 15, 2019, as extended, and such other relief as necessary to consolidate 3 approved office/warehouse buildings into 2, resulting the same approximate gross floor area, and make related improvements in the Industrial Park and South Hingham Development Overlay Districts.
- J. Tocchio Letter to C. Falvey, dated October 11, 2022
- Form 2 Application for Zoning Hearing, dated October 11, 2022
- Form 2D Application for Modification of a Special Permit A2, dated October 11, 2022
- Application for Modification of a Special Permit A3, dated October 11, 2022
- Supplement to Application for Modification of Site Plan Approval and Modification of Special Permit A3, dated October 11, 2022
- Plan Set, dated October 7, 2022
- Floor Plans and Elevations, dated October 7, 2022
- Stormwater Report, dated October 7, 2022
- Peer Review Comments from P. Brennan, dated November 3, 2022
Previous Decisions
- Site Plan Approval, dated February 15, 2019
- Special Permit A3, dated February 15, 2019
19 Whiting Street
Site Plan Review Waiver and Special Permit A3 Modification
Merhej and Sons Realty submitted a request for a waiver of Site Plan Review under § I-I,9 and an application for modification of a Special Permit A3 Parking Determination under § V-A of the Zoning By-Law, to modify plans approved in connection with a Site Plan Approval and Special Permit A3 issued December 14, 2020, and such other relief as necessary to add an additional pump island to the existing filling station in the Business B District and Accord Pond Watershed and Hingham Aquifer Protection Overlay District.
- J. Tocchio Letter to C. Falvey, dated October 11, 2022
- Form 2 Application for Zoning Hearing, dated October 11, 2022
- Form 2C, Special Permit A1, dated October 11, 2022
- Application for a Special Permit A-3, dated October 11, 2022
- Supplement to Application for Modification of Site Plan Approval and Modification of Special Permit A3, submitted October 11, 2022
- Site Plan, dated October 11, 2022
- Site Plan with Paved Area Calculation, dated October 11, 2022
- Continuance Request, dated December 2, 2022
- Traffic and Circulation Cover Letter, dated December 14, 2022
- Traffic and Circulation Plans, dated December 14, 2022
- Traffic Impact Study Update, dated December 14, 2022
Previous Decisions
- Site Plan Review Decision, dated December 14, 2020
- Special Permit A3 Decision, dated December 14, 2020
Peer Review
- J. Dirk Peer Review Report, dated January 3, 2023
- J. Dirk Parking Comments, dated January 3, 2023
222 South Pleasant Street
Site Plan Review
CPC Pleasant Street LLC submitted an application for Site Plan Approval with Waiver Requests under § I-I of the Zoning By-Law and such other relief as necessary to raze and rebuild a single-family dwelling, two car attached garage, accessory building with one car bay and office, pool, pool house, tennis/sports court, hardscaping, landscaping and other improvements at the property in the Residence C District.
- Site Plan Approval Application Package, dated October 10, 2022
- Existing Conditions Plan, dated September 20, 2022
- Proposed Conditions Plan, dated September 19, 2022
- Site Plan Set, submitted October 10, 2022
- Stormwater Management Report, dated October 6, 2022
- Stormwater Management Analysis, dated September 20, 2022
- Grading Drainage and Utilities Plan, revised through October 20, 2022
- Site Plan, page 4, revised through October 20, 2022
- Stormwater Management Report, submitted October 20, 2022
- Updated Landscape Plan, submitted October 26, 2022
- Landscape Plan, revised October 28, 2022
- Landscape Plan in Color, revised October 28, 2022
- Response to L. Fournier Comments, dated October 31, 2022
- Stormwater Management Report, revised October 31, 2022
- Site Plan Sheet 1A, revised October 31, 2022
- Landscape Plan, revised November 2, 2022
- Responses to Staff Comments, dated November 21, 2022
- Plan Set, revised November 21, 2022
- Arborist Letter, dated November 29, 2022
- Existing Conditions Plan, revised November 30, 2022
- Layout and Materials Plan, revised November 30, 2022
- Utility Plan, revised November 30, 2022
- Photometric Plan, received December 1, 2022
- Response to Peer Review Comments, received December 2, 2022
- Stormwater Management Report, received December 2, 2022
- Water Quality Calculations, received December 2, 2022
- Recharge Volume Calculations, received December 2, 2022
- Landscape Plan, revised December 12, 2022
- Retaining Wall Images
- Plan Set, revised December 14, 2022
- Pre-Development Stormwater Plan, received December 15, 2022
- Post-Development Runoff Calculations, received December 15, 2022
- Post-Development Stormwater Plan, received December 15, 2022
- Stormwater Management Analysis, received December 15, 2022
- Retention Systems Analysis, received December 15, 2022
- Site Soils Data, received December 15, 2022
- Recharge Volume Data, received December 15, 2022
- Water Quality Volume Data, received December 15, 2022
- Response to Peer Review Comments, dated December 15, 2022
- Street View Renderings
- Rendering Vantage Points, dated December 19, 2022
- Continuance and Extension, dated December 20, 2022
- Landscape Plan Revisions Memo, dated December 29, 2022
- Supplementary Photos
- Site Plans, revised December 29, 2022
- Response to Neighbor Concerns, dated December 29, 2022
- Site Plans, revised January 24, 2023
- Explanation of Revisions, dated January 26, 2023
Peer Review
- P. Brennan Peer Review Report, dated November 22, 2022
- P. Brennan Peer Review Report, dated December 15, 2022
Public Comment
- Public Comment from R. and K. Otto, dated December 15, 2022
- Public Comment from J. Ostheimer, dated December 19, 2022
107 Main Street
Request for Endorsement of an ANR Plan
Matthew Smith, Manager Dover Mills LLC submitted an application for a Form A Application For Endorsement of an Approval Not Required (ANR) plan under the Subdivision Control Law for property located at 107 Main Street in Residence District A.
- Form A Application, dated August 2, 2022
- Plan, dated August 2, 2022
- Email from D. Jordan Regarding ANR Filing, dated August 3, 2022
- Withdrawal Request, dated August 9, 2022
- Ellis Certification, dated August 22, 2022
261 Gardner Street
Form C - Application for Approval of Definitive Subdivision Plan
Joseph Cincotta submitted a Form C - Application for Approval of Definitive Subdivision Plan under the Subdivision Control Law and the Rules and Regulations of the Planning Board at the property in the Residence B District.
- W. Sullivan Letter to Planning Board, dated July 27, 2022
- Form C - Application for Approval of Definitive Subdivision Plan
- Plan Set, dated July 22, 2022
- Stormwater Management Report, dated July 2022
- Import-Export Analysis, dated July 8, 2022
- Foley Authorization Letter to J. Sneath, dated July 25, 2022
- C. Osinski Letter of Support to J. Sneath, dated July 25, 2022
- S. Sarni Memo to Planning Board, dated September 7, 2022
- W. Sullivan Continuance Request to Planning Board, dated September 14, 2022
- Definitive Subdivision Plan, revised through September 30, 2022
- Stormwater Management Report, revised through September 2022
- Weir River Water Supply Letter, dated September 13, 2022
- Hingham Light Cost Estimate Letter, dated August 4, 2022
- Fire Marshal Letter, dated October 18, 2022
- DPW Comments from R. Sylvester, dated October 24, 2022
- Stormwater Report, revised November 2022
- Sight Distance Letter, dated November 7, 2022
- Subdivision Plans, revised November 14, 2022
- Responses to Traffic Peer Review Comments, dated November 14, 2022
- Responses to Civil Peer Review Comments, dated November 14, 2022
- Responses to Staff Comments, dated November 14, 2022
- Subdivision Plans, revised November 15, 2022
- Continuance and Extension, dated December 2, 2022
- Subdivision Plans, revised December 7, 2022
- Stormwater Report, revised December 7, 2022
- Narrative of Revisions, dated December 9, 2022
- DPW Comments from R. Sylvester, dated December 12, 2022
- Subdivision Plan Sheet 10, revised December 14, 2022
- Subdivision Plan Sheet 5, revised December 16, 2022
- Response to Peer Review and Staff Comments, dated December 16, 2022
Peer Review
- P. Brennan Peer Review Letter to Planning Board, dated October 11, 2022
- J. Dirk Traffic Peer Review Letter to M. Silveira, dated October 17, 2022
- P. Brennan Peer Review Letter, dated November 16, 2022
- J. Dirk Traffic Peer Review Letter, dated November 17, 2022
- P. Brennan Peer Review Letter, dated December 12, 2022
- J. Dirk Traffic Peer Review Letter, dated December 12, 2022
Preliminary Subdivision Decision
- Notice of Decision, dated May 26, 2022
107 Main Street
Request for Endorsement of an ANR Plan
Matthew Smith submitted an application for a Form A Application For Endorsement of an Approval Not Required (ANR) plan, dated June 18, 2022, under the Subdivision Control Law for property located at 107 Main Street in Residence District A.
- Form A Application, dated June 21, 2022
- Plan, dated June 18, 2022
- Correspondence from Atty Sullivan, representing abutters, dated June 27, 2022
- Public Comment and Photos, received June 28, 2022
- Email Commentary, dated June 28, 2022
- ANR Exhibits, dated June 28, 2022
- Additional Email Commentary, dated June 28, 2022
- 1929 Plan of Land
- Additional Photos
- Second Set of Additional Photos
107 Main Street
Request for Endorsement of an ANR Plan
Matthew Smith submitted an application for a Form A Application For Endorsement of an Approval Not Required (ANR) plan, dated May 18, 2022, under the Subdivision Control Law for property located at 107 Main Street in Residence District A.
- Form A Application, dated June 14, 2022
- Plan, dated May 18, 2022
- Correspondence from Atty Sullivan, representing abutters, dated June 27, 2022
- Public Comment and Photos, received June 28, 2022
- Email Commentary, dated June 28, 2022
- ANR Exhibits, dated June 28, 2022
- Additional Email Commentary, dated June 28, 2022
- 1929 Plan of Land
- Additional Photos
- Second Set of Additional Photos
274 South Street
Site Plan Approval and Special Permit A3 Parking Waiver
The Town of Hingham filed an application for Site Plan Review under § I-I and a Special Permit A3 Parking Determination under § V-A of the Zoning By-Law and such other relief as necessary to construct a new pool complex including a 5,000+ SF bathhouse, fenced pool area, filtration structure, equipment storage building, equipment pad and other improvements at the South Shore Country Club, 274 South Street, in the Business Recreation District.
- Site Plan Approval Application, dated April 12, 2022
- Special Permit A3 Parking Determination Application, dated May 2, 2022
- Outdoor Pool Complex Parking Plan, dated March 17, 2022
- Stormwater Report and Operations and Maintenance Plan, dated January 5, 2022
- Parking Plan with EV Charging Spaces, dated May 2, 2022
- Plan Set, dated March 17, 2022
- P. Brennan Peer Review Letter to Planning Board, dated May 16, 2022
- J. Dirk Letter to M. Silveira Regarding Traffic Peer Review, dated May 16, 2022
- Photos, Views from Del Prete Drive
- Traffic and Parking Management Plan
- Site Plans, revised May 20, 2022
- J. Jackson Response to Peer Review Letter to M. Silveira, dated May 20, 2022
- J. Jackson Response to Traffic Review Letter to M. Silveira, dated May 20, 2022
- Fire Truck Turning Movements Plan, dated March 17, 2022
- Trash Truck Turning Movements Plan, dated March 17, 2022
- Memo to Planning Board from Neighbors Regarding Concerns , dated May 23, 2022
- Letter to Planning Board from Abutters, dated May 22, 2022
- K. Zick Letter to M. Silveira Regarding Tree Protection Plan, dated May 23, 2022
- Existing Tree Plan, received May 23, 2022
- Planting Plan, received May 23, 2022
- Memo from B. Homes to SITEC Regarding Review of Existing Conditions, dated February 12, 2021
- Existing Conditions & Wetlands Resource Area Plan, dated April 5, 2021
- J. Dirk Letter to M. Silveira Regarding Traffic Engineering Review, dated May 23, 2022
- Continuation and Extension Request, dated May 25, 2022
- Additional Peer Review Letter from P. Brennan to Planning Board, dated May 25, 2022
- Letter of Support from E. Congdon to E. Wentworth, dated May 30, 2022
- K. Smallcomb Email to E. Wentworth, dated May 31, 2022
- K. Forbes Email to E. Wentworth, dated June 2, 2022
- Fire Truck Vehicle Turning Movements, received June 6, 2022
- Western Lot Vehicle Turning Movements, received June 6, 2022
- Hydrant Access General Plan, received June 6, 2022
- Crosswalks and Sidewalk Plan, dated June 9, 2022
- Jones Copy of 2005 DPH Memo, received June 9, 2022
- J. and K. Shroff Support Email to E. Wentworth, dated June 9, 2022
- G. and M. O'Meara Support Email to E. Wentworth, dated June 9, 2022
- E. and J. Cignetti Support Email to E. Wentworth, dated June 9, 2022
- J. Jackson Response to Traffic Review Comments, dated June 8, 2022
- Sheet C5.4 Plan, revised through June 9, 2022
- Traffic Plan, received June 9, 2022
- General Plan, received June 9, 2022
- J. Dirk Supplemental Traffic Peer Review, dated June 13, 2022
- E. Sullivan email to M. Silveira Regarding Conservation Review, dated June 14, 2022
- Continuance & Extension, dated June 17, 2022
- J. Jackson Response to Traffic Review Comments to M. Silveira, dated June 22, 2022
- Updated General Plan, received June 22, 2022
- J. Dirk Supplemental Traffic Review Letter to M. Silveira, dated June 30, 2022
- Acoustic Review & Feedback Report, dated July 6, 2022
- Traffic and Parking Management Plan, revised July 6, 2022
- Landscape Plan, revised July 6, 2022
- S. Jones email to Planning Board, dated July 11, 2022
- E. Sullivan Response to Public Comment, dated July 11, 2022
- Continuation Request, dated July 19, 2022
- DaSilva Certification, dated July 26, 2022.
- Letter from K. DiFazio to Planning Board, dated July 25, 2022
- Email from C. Galgay to Planning Board, dated July 29, 2022
- C. Rotti email to K. Whalen, dated July 29, 2022
- Land Court Appeal, dated September 8, 2022
213 & 215 Cushing Street
Flexible Residential Development
Jeffrey Tocchio, Esq. on behalf of Bristol Bros. Development Corp. filed an application in connection with its proposed Flexible Residential Development pursuant to Section IV-D of the Zoning By-Law, for the property located at 213 and 215 Cushing Street in the Residence C District.
- Flexible Residential Development Summary from 2001 Town Meeting
- Letter from J. Tocchio to C. Falvey and K. Ellis, dated August 19, 2021
- Application for Zoning Hearing, Form 2, dated August 19, 2021
- Application for Special Permit A-3, dated August 19, 2021
- Application for Site Plan Approval in Association with Application for Building Permit, dated August 19, 2021
- Supplement to Applications, dated August 19, 2021
- Plans, dated August 19, 2021
- Memo from E. Sullivan to Planning Board, dated September 8, 2021
- Letter from S. Sarni to Planning Board, dated September 15, 2021
- Letter from C. DiNapoli to Planning Board, dated September 16, 2021
- Letter from A. and R. Gomez to Planning Board, dated September 21, 2021
- Letter from P. Brennan to Planning Board, dated September 21, 2021
- G. Crocker letter to Planning Board in Response to Peer Review, dated September 23, 2021
- Updated Conceptual Subdivision Plan, dated September 23, 2021
- Letter from L. Schneiderhan to Planning Board, dated September 27, 2021
- Continuation and Extension Request, dated September 29, 2021
- Letter from J. Dirk to E. Wentworth Regarding Traffic Analysis, dated November 1, 2021
- Continuation and Extension Request, dated November 4, 2021
- Fully Executed and Filed Continuation and Extension Request, dated November 10, 2021
- Continuation and Extension Request, dated December 10, 2021
- Fully Executed Continuation and Extension Request, dated December 15, 2021
- Continuation and Extension Request, dated December 21, 2021
- Town Clerk Stamped Fully Executed Continuance and Extension Request, dated January 10, 2022
- J. Tocchio Letter to C. Falvey and K. Ellis Regarding Revised Materials, dated January 12, 2022
- Preliminary Plans, Revised through January 7, 2022
- G. Crocker Letter to Planning Board Regarding Response to Amory Engineers Peer Review, dated January 12, 2022
- G. Crocker Letter to Planning Board Regarding Response to Vanasse & Associates Peer Review, dated January 12, 2022
- J. Dirk Letter to E. Wentworth Regarding Response to Traffic Peer Review, dated January 14, 2022
- G. Crocker Letter to Planning Board Regarding Response to Vanasse & Associates Peer Review, dated January 19, 2022
- Preliminary FRD Sight Distance Exhibit, dated January 18, 2022
- P. Brennan Letter to Planning Board, dated January 20, 2022
- J. Dirk Letter to E. Wentworth Regarding Response to Traffic Peer Review, dated January 21, 2022
- Continuation and Extension Request, dated January 26, 2022
- Revised Plan Set, dated February 24, 2022