Resources

Visioning Session information 

Working Drafts

Existing Reports, Studies and Data

to support the update of the Master Plan

  1. RFP Hingham Comprehensive Master Plan 2018
  2. Barrett proposal
  3. July-20-2015-Presentation-to-the-Planning-Board-and-Conservation-Commission-PDF
  4. Hingham-Climate-Change-Vulnerability-Risk-Assessment-and-Adaptation-Final-Report-PDF
  5. SHSG-Final-Report_November-2017
  6. SHSG-to-BOS-Nov-7-2017
  7. Aging-in-Hingham-
  8. HINGHAM-MA-Demog-2018-8-9-Rev-2
  9. Merchants Lot Parking Observations 02.09.18
  10. map of merchants lot
  11. Station Street Parking Observations 08.15.17
  12. Shared Parking Model Update 08.21.17
  13. 2001MasterPlanPart1
  14. 2001MasterPlanPart2
  15. 2001MasterPlanPart3
  16. 2001MasterPlanPart4
  17. 2001MasterPlanPart5
  18. MGL Ch 41 Sec 81D
  19. 2019 Field Study RFP - final
  20. Hingham Public Library Long Range Plan 2016-2020
  21. Final MPLCP Grant Application
  22. DRAFT-Open-Space-and-Recreation-Plan-2016-2023-PDF
  23. Final-Hingham-Comprehensive-Trail-Plan-PDF
  24. Final-Plans-Appendix-PDF---Large-File
  25. Scenic-Road-Regulations-PDF
  26. Scenic-Roads-PDF
  27. Hingham Recreation Inventory Matrix
  28. FLAGPOLES
  29. MILITARY-VETERAN WAR MEMORIAL DAY 2019_list of facilities
  30. Recreational Field Map_sm (003)
  31. April 6, 2019 Board of Selectmen Public Information Meeting on Water Company Aquisition
  32. 072218_Aquarion 2017 DPU Report
  33. 072218_AWC_Filing_infraPLAN KANEW Study_201807300904550035
  34. April 23, 2007 - Water Supply and Distribution System Study (PDF)
  35. 020918_Tata Howard Capital Efficiency Plan_21 Nov 2014
  36. Hingham WSC Presentation 9.26.16
  37. Water Supply Committee report 8-27-03 (amended)
  38. FINAL Cover Letter and Report SEWER
  39. Three Station Report SEWER
  40. Report COMPLETE 4.01.16 SEWER
  41. Climate Change Memo
  42. Sewer 5 Year Capital Plan 2020-2024
  43. Transfer Station 5 Year Capital Plan 2020-2024
  44. Hingham CC Vulnerability_ Risk Assessment _Adaptation Study_Final_Report
  45. FINAL Cover Letter and Report Climate Change - Stat needs
  46. South Shore Country Club - Engineering study of facilities April 2006 part 1 of 2
  47. South Shore Country Club - Engineering study of facilities April 2006 part 2 of 2
  48. Engineering reports on condition of pool at South Shore Country Club
  49. Norwell Traffic Impact Study
  50. SSCC CPC application for pool 2019
  51. CPC application - Rendering 11.4.19
  52. Country Club Fact Sheet 11.5.19
  53. Library needs statement 2014
  54. Final-MVP-Summary-of-Findings-Report-2019-06-26-PDF
  55. Final-MVP-Summary-of-Findings-Report-Appendices-2019-06-26-PDF
  56. CTPS Transportation Access Studies of CBDs
  57. Norwell rezoning study area map
  58. Article on housing trends which references the shipyard
  59. Public Comments submitted online 1
  60. Public comments submitted online 2
  61. public comments 3
  62. Article on housing trends which references the shipyard
  63. Copy of Master plan residential demo report
  64. Copy of Master plan residential new construction report
  65. Final draft AW Perry South Hingham report
  66. Article on senior housing glut
  67. Article about first Visioning Session
  68. Residential Demolition data and Residential new construction data
  69. Public Comments submitted online 4
  70. Public Comments submitted online 5
  71. Public Comments submitted online 7.
  72. Public Comments submitted online 6
  73. Public Comments submitted online 8.
  74. Public Comments submitted online 9
  75. Concord Energy Future Task Force
  76. Belmont Climate Action Plan
  77. Reading Climate Change Adaptation Report 2014
  78. Hingham Round 12 Grant Application Table
  79. Hingham CR3 - Energy Reduction Plan 10-25-18 (BMMM edits) (NS edits)
  80. Public Safety Complex 031020
  81. The fiscal challenges of climate change - The Boston Globe

Kleinfelder data